From: route@monster.com
Sent: Friday, April 15, 2016 10:19 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: CS UT
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
LORENZO A. QUINTILLANO email address:
lquintillano@yahoo.com Mobile Phone No.
: 714-588-7917 Home Address: 6436 Jade Mountain Court
Las Vegas, NV 89139 SUMMARY OF TECHNICAL SKILLS · Installed
& Integrated Ericsson RBS 2000 & RBS 3000 family · Installed
& commissioned Nokia 2G/3G/4G · Installed
& re-configured Nokia Ultrasite (2G) · Installed
& commissioned router for AT&T ETTCS project · Civil
works on T1/Fiber Optic path from LEC point to end-user facility · Include
running DS3 cables & termination of CAT 5 / CAT6 / 25 pairs cables
to 66 block/110 · RF
line Sweep Testing using Anritsu RL/DTF · OTDR
Fiber Scoping and Testing using Exfo and ODM equipment · Decommissions
Ericsson/Nokia Ultrasite cabinet, · MCPA
harvest TECHNICAL EXPERIENCE MYCOM-North America
July
18 2011 to January 16 2015 T-MOBILE/NOKIA
Equipment - SPRINT/SAMSUNG 2.5 Add Project
· Close
Out Packages for Nokia/T-Mobile use of Excel spreadsheet, pdf, word, power
point etc · Work
on sites punchlists · Installation
of ESMB, FSME, FSMF, FXFB, 2G/3G/LTE- NOKIA for T-Mobile
Modernization RA700 · Nokia
Ultrasite 2G Cabinet Re-groom · RF
line Sweep Testing using Anritsu · Site
survey/Audit/ QA/.QC · Install
NOKIA UMTS cabinet · Nokia
Ultrasite T1 harvest & 2G Cabinet re-groom · OTDR
Fiber Scoping and Testing using Exfo and ODM equiptment · ETTCS
Project for AT&T Desert Southwest/ Rocky Mountain Region & Pacific
Northwest- Infrastructure work for Fiber Optic Delivery to cell site · 7705
router Installation & ACAT programming · Site
survey/walk for ETTCS · T1
L2 testing using T-BERD for T1 expansion · Install
URC SIAD for 3G T1 expansion DATALOGIX TEXAS AT&T PNW NORTH TEXAS
November 2009 to May 2011 · Pre
cabling Include running DS3 cables & termination of CAT 5 / CAT6
/ 25 pairs cables · T1
L2 testing using T-BERD for T1 expansion · Install
URC SIAD for 3G T1 expansion · Install/
Integrate RBS 3418/3518 for UMTS 3rd
/4th
Carrier add · Tiger
Team for alarm clearing ORIN USA September 2008 to August 2009 T-Mobile
Southern Calfornia/ AT&T Oklahoma and Arkansas · Installation/
Integration of RBS 3106, 3206, 2206, 2106 · RBS
3106 cabinet re-groom · Installation
of PBC6500, PBC 02 and RRU · Installation
and troubleshooting of LMU · Conducted
QA of the cabinets installed · Performed
T1 testing · Site
Survey for UMTS PH2 project · Determined
the point of feed for power supply · Documented
and photographed the survey conducted · Verified
location of UMTS Cabinet based on plan · Make
Recommendation based on the survey conducted · Installation/
Commisioning of 3106, 2206, 2106, and 3206 · Conducted
QA of the cabinets installed. · Performed
T1 testing DATALOGIX TEXAS
September 2007 to August 15, 2008 AT&T
Los Angeles - UVERSE Project · Conducted
Field Survey for power supply to Fiber Cabinet · Determined
the point of feed for power supply · Documented
and photographed the survey conducted · Make
proposal for the location of Fiber Cabinet · Verify
location of Fiber Cabinet based on plan · When
issues arise, present alternative solution TRAININGS & CERTIFICATION ·
LTE RBS 6000 Installation and
Integration ·
RT-2 Certified Administered
by: Ray Laws PARSONS
Sr. Quality Auditor &, Certification Administrator ·
OSHA CAL /OSHA 10 ·
AT&T Ask Yourself- April 18,
2013 ·
AT&T Methods of Procedures-
June 2, 2013 ·
AT&T SUPPLIERS AWARENESS-July
23, 2013 ON THE JOB TRAINING July
2, 2007 to July 27, 2007 VERSACOM
OSP / AutoCAD / F2 Conditioning Training ·
F2 conditioning Design and Work
Order preparations which include cost estimations, detailed drawings and
associated forms to be approved in the reconstruction of existing copper
distribution plants. ·
Outside Plant Engineering of
Fiber/Copper OSP projects including new subdivision layout, Rehabilitation
and relocation of cable facilities. ·
Design and Revisions of Work Order
permits for outside plant facilities, conduit systems, buried and aerial
facilities for both copper and fiber. ·
Maintain documentation and
drawings in AutoCAD. ·
Conduct field measurements for
cable and bore details, hand holes, and access cabinet details. ·
Makes sound engineering judgment
in the field concerning cable footages, terminal and hand holes placements,
etc. ·
Interprets and designs outside
plant plans and records from draft form. ·
Right of Way/Easement
documentation knowledge. ·
Perform site surveys. Develop
material lists, cable running lists and detailed installer instructions. Ericsson
UMTS CD Instruction Completed
August 30, 2006 July
20, 2006 to August 9, 2006
AT&T Chicago, IL GSM EXPANSION ·
Installation of RBS 2206 cabinets
(from base frame up to the main cabinet) ·
Assisted in the installation
of RBS 2106 including BBU and interconnection of batteries ·
Installation of T1
cables from the NIU to the RBS, including dressing of cables to the
ladder rack and termination with RJ45 connectors ·
Termination of power cables to RBS
2206 and RBS 2106 COMPUTER
SKILLS ·Microsoft Excel - Basic
(extensive) ·Microsoft Word ·Intermediate Microsoft
Power Point ·Microsoft Outlook ·Dropbox REFERENCES; David Roscher, PMP Project Manager MYCOM-NORTH
AMERICA PNW 15340 NE 92nd St. BLDG D Redmond, WA 98052 714 6515996 (MP) Abelardo
Muyco III Project Manager Datalogix-texas, Houston
TX Cell
(214) 717 9036 www.datalogixtexas.com |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Advanced |
|
|
Tagalog |
Fluent |
|
|
|